They're not built for every appliction, honestly—the medium-pressure rating means you'll want to avoid extreme high-load scenarios, but for most industrial machinery and excavator work, these double-acting piston cylinders handle the job reliably enough that we've had buyers come back for over a decade.

The real value is in the ISO9001 and CE certifications, which we've held for 20-plus years, so every batch gets a COA and we actually do raw material inspection before welding the stainles or carbon steel bodies, not just final testing after assembly.

Lead time typically runs 4-6 weeks for custom OEM orders, but if you need a standdard size, we can push it to 20 days or so—just confirm stock before placing the PO.


We've found the high-tempearture resistance works best when you're running continuous cycles above 80°C, though the seals can degrade faster if you push past 200°C without a cooling circuit (most buyers don't need that anyway).

To order, send your bore diameter, rod size, stroke length, and port configuration—we'll quote within 48 hours and the MOQ is usually 50 units for custom builds, but our company can flex on that if you've got a solid track record.

Just keep in mind these aren't designed for subsea or explosive environments; carbon steel option is cheaper but the stainless version adds about 15% to the unit cost, which most buyers go with for corrosion resistance.
Yes, we can build cylinders with a stainless steel rod and carbon steel barrel, or any combination you need. Just tell us which parts require corrosion resistance and which can be standard carbon steel.
For a standard custom spec, our MOQ is 50 units. If you need a smaller batch for testing, we can discuss a trial run — just reach out with your target volume.
Absolutely. Every order comes with mill test certificates for the steel, and we can include ISO9001 and CE documentation upon request. RoHS compliance reports are also available.
For a full production run of, say, 500+ units, expect around 4-6 weeks from design approval. Smaller quantities can ship in 2-3 weeks, depending on customization complexity.
We pack each cylinder individually in rust-proof VCI paper, then strap them to wooden pallets and wrap with stretch film. For sea freight, we add a waterproof outer layer and fumigation-treated crates.