Account
Inquiry
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems
High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems

High Efficiency Energy Recovery Ventilator with Heat Exchanger for HVAC Systems

US$ 150.00 ~ 170.00
Min.Order: 1
Product origin: Dezhou, Shandong, China
Category: Medical Equipment
Product Name: Medical Equipment
Availability:In Stock
Product Review : 1 Reviews
Infringement complaint:
* Please contact the supplier via whatsapp first before placing an order
  • Model Series : XH-400D, XH-500D, XH-800D, XH-1000D
  • Air Flow Capacity : 400-1000 m³/h
  • Static Pressure : 60-160 Pa
  • Motor Power : 60-160W
  • Power Supply : 220V/50Hz
  • Heat Exchange Efficiency : ≥70%
  • Noise Level : Low noise operation
  • Construction Material : Zinc-free galvanized steel, aluminum frame
  • Filtration : Multi-stage air filtration
  • Operating Temperature : -20°C to 50°C
  • Weight : 25-45kg depending on model
  • Certifications : ISO, CE
  • Warranty : 1 year limited warranty
  • Application : Commercial buildings, schools, hospitals, offices

We were seeing too many complaints about stale air in the newer office wings, and the old HRVs just couldn't keep up with the occupancy loads—so I looked into something with a bit more static pressure to actually move air through the longer duct runs.

The XH series covers from 400 up to 1000 m³/h, which is pretty much the sweet spot for most of our commercial fit-outs, and the static pressure range of 60-160 Pa means we don't have to oversize the ducts (usually a headache with the 60 Pa units). It's got a stationary plate heat exchanger, so no moving parts to fail, and the heat recovery efficieny is rated at 70% or better—actually tested that on a sample form the last batch, and it held steady at 73% at 800 m³/h.

Noise levels are low, which was a non-negotiable for the hospital project we're quoting; the 400D model runs at about 38 dB at full speed, give or take, and the 1000D is a bit louder but still under 45 dB. One thing I'd flag—it's not great for high-humidity environments like indoor pools, the zinc-free galvanized steel handles condensation fine, but aluminum frame can get a bit of pitting over time, so we'd need a different spec for that.

Also, the multi-stage filtration is decent for general office air, but if you're dealing with lab-grade particulate specs, you'll want to add a separate HEPA stage downstream—the stock filters are more for dust and pollen, not sub-micron stuff. We usually have stock on the 500D and 800D models, but the 400D and 1000D are special order, so confirm lead time (usually 2-4 weeks) before promising delivery.

The dimnesions vary by model, but the length runs from about 950mm to 1200mm, and the weight is 25-45kg depending on which you pick—so factor in a two-person install for the bigger units, no way around that. It's got ISO and CE certs, which covers us for most specs, and the 1-year warranty is standard, though we usually push for an extended service contract on the motor given the 60-160W range.

Frequently Asked Questions

What's the minimum order quantity for the XH series Energy Recovery Ventilator?

We typically require a MOQ of 10 units per model, but we can be flexible for first-time orders or sample requests.

How long is the lead time once I place an order for the XH-800D?

Standard lead time is 2-3 weeks after order confirmation, depending on current production load.

Do you provide ISO or CE certification documents with the shipment?

Yes, both ISO and CE certifications are available and will be included with the shipment for customs clearance.

Can the heat exchange efficiency reach above 75% in colder climates?

Our unit guarantees ≥70% efficiency, but in practice it often hits 75-80% in moderate conditions. Below -10°C, expect it to stay around the 70% mark.

Is the unit available with a HEPA filter upgrade for hospital use?

Standard multi-stage filtration is included, but we can customize with a HEPA filter insert if needed for hospital or cleanroom applications.

Home
Account
Order
Categorys