Your custmer's site crew needs to sink piles into rocky mining ground or compacted construction fill, and the HWL300R will punch through with that 100MPa work pressure—it's basically a 7.5-ton diesel hammer that rotates a full 360°, so they can angle piles without repositioning the whole rig.

We typically stock these with 3m, 4m, 5m, or 6m chute strokes depending on what depth they're after, and most buyers go with the 5m for general foundation work since it handles round, square, or rectangular piles without swapping attachments.

Lead time runs about 30 days or so for a single unit, but if you're ordering 5 or more our company can usually shave that to 20 working days—confirm lead time before you lock in the PO though, because Yuchai engine supply can get tight around harvest season.


85kW at 2600RPM gives you enough torque (375N·m) to drive through clay and weathered rock, but it's not suited for solid granite bedrock—you'd need a bigger hammer or pre-drilling for that, and the noise rating says 'without noise' which basically means it meet CE limits, not that it's silent on site.

The drill pipe diameter is 100mm, and the hydraulic hammer model is 100, so replacement parts are pretty much standerd across the line—buyers always ask about teh 100MPa pressure rating and whether it'll hold up in hard soil, and yeah, we've run these in freeze-thaw conditions without seal failures so far.

Bulk pricing on 10 units or more drops roughly 12% form the single-unit cost, and our company provide COA and SDS with every shipment—the the frame and transmission for 12 months, but the diesel hammer tips are considered consumables (check that in the terms).
We typically require a minimum order of 1 unit for the HWL300R, but we can discuss larger quantities if you need a fleet.
The HWL300R is certified with CE and ISO 9001:2000, so you're covered for quality and safety standards in most markets.
Yes, the HWL300R supports drill pipe specifications of 3m, 4m, 5m, and 6m, so you can pick the length that fits your project.
Lead time is usually 2-4 weeks depending on current stock and order volume, but we'll confirm once you place an order.
The HWL300R is listed as 'without noise' in the specs, meaning it operates quietly compared to standard pile drivers, making it suitable for noise-sensitive areas.