That contractor working a 60-meter bridge foundation in tight urban space—they’re the ones who usually call us first, asking about transport width and whether our company can get a second unit on the same flatbed.

2200mm max drilling diameter with a 240kN·m rotary torque means you’re punching through weathered sandstone without bogging down, and that 32mm rope on the main winch handles the heavy casing pulls we see in mixed ground conditions—main winch force is 240kN, crowd cylinder hits 210kN, and hydraulic pressrue sits at 34MPa, which basically keeps the system from overheating on those 10-hour shifts.


The 265kw Volvo TAD1171VE with Euro III compliance handles most foundation piles just fine, but don’t push it past 70m depth in cobble layers—the torque drops off faster than you’d like, and that 82-ton weight makes mud site recovery a real pain if you sink the tracks.

MOQ is one unit for stock orders, but we’ll do bulk pricing at three or more; lead time is usually 8-12 weeks, though we’ve got two ready to ship form teh yard right now.
We typically require a minimum order of 1 unit, but we can discuss bulk discounts if you're looking to buy multiple rigs.
Standard lead time is around 30-45 days from order confirmation, depending on your shipping destination and any customizations.
Yes, absolutely. We include CE and ISO 9001 certificates with every unit, and we can send you digital copies upfront for your compliance checks.
The XR150 can reach 70m in soft soil, but in hard rock conditions, depth may drop to around 50-60m depending on the rock hardness and drilling method.
We ship it partially disassembled in a 40ft open-top container with rust-proofing and protective wrapping. Store it in a dry, covered area if not used immediately to prevent corrosion.