We keep a solid stock of these on hand, so lead time is usually around 2-3 weeks for standdard configurations, though custom lengths up to 3300mm can push it to 5 weeks or so (check with us first). The gold reflector option is the most popular for industrial use because of that it boosts directional heating effiency to about 86%, and response time is under 2 seconds—pretty much instant heat for your process.

Most buyers go with the 12mm diameter tubes for general industrial heating, but if you're targeting a specific materail, the wavelength range form 0.9μm short wave to 3.5μm medium wave lets you dial in absorption. They're not great for ambient space heating, actually—these are for direct, focused heat on a workpiece or conveyor line.


You'll get a CE-compliant unit with a warranty covering 5000-8000 operating hours, and our company can ship in dual-tube configurations if you need higher power density. operating temperture hits 1000°C+, so it handles tough environments, but cold chain isn't an issue—just standard packaging with foam inserts to protect the quartz.

Power options run from 50W all the way up to 10,000W, and voltage can be 120V to 480V, so it fits most industrial setups without a transformer. We usually have stock for the 10mm and 15mm diameters, but the 11×23mm oval tubes are special order only.
MOQ depends on the specific specs you need, but for standard sizes like 10mm or 12mm diameter in short wave, we can start from 50 pieces. Custom lengths or dual tube setups may require 100-200 pieces.
Yes, every order comes with a CE declaration of conformity and test reports. Just let your sales rep know if you need the documents included in the package.
Absolutely. Gold reflector is available on that tube size, and we can match it with 480V. Just confirm the exact power rating you need, and we'll adjust the winding accordingly.
Keep them in a dry, clean place at room temperature, away from moisture and direct sunlight. The quartz tubes are fragile, so store them in the original packaging or a padded rack to avoid breakage.
For that configuration, lead time is usually 15-20 working days. Standard specs ship faster, but custom builds need a bit of extra time for the gold coating and winding setup.