We've been shippng the CTL827 for about six months now, and it's basically a four-in-one system that handles cryo, laser, RF, and cavitation in one go — most clinics we work with prefer it over running separate machines.
It's pretty much designed for abdomen and thigh work, but small cryo handle makes the double chin a breeze, and honestly, the 650nm laser does a decent job on skin tightening while the 980nm goes deeper for fat metabolism.
The cooling hits -16°C to 5°C, and the RF runs at 5MHz, with cavitation between 35-40KHz — you'll get 104 Mitsubishi diode lasers at 130-350mW, and the whole unit draws under 400W, which is nice for busy clinics with limited circuits.
It weighs 50kg and stands 78x58x121cm, so it's not a desktop toy, but the 8-inch touch screen is intuitive enough that new staff pick it up in a session or two, and the 9L pure water cooling system handles back-to-back treatments without overheating.
We usually have stock on the three cryo handles (small, medium, large), and the vacuum presure is 100Kpa — one thing buyers don't always ask is that the 5MHz RF is better than most 1MHz units for collagen remodeling, but it's not ideal for very thin skin areas like around the eyes.
CE and ISO13485 are in place, and we typically ship with a COA and TDS for each unit — lead time is about 20 days or so, but confirm if you need express since teh 50kg crate takes some logistics.
Yes, all 104 diodes are genuine Mitsubishi ML101J27 lasers. The 650nm wavelength works on fat reduction, while the 980nm targets skin tightening and collagen stimulation.
The machine ships dry—no water inside to avoid damage during transit. You just fill the tank with 9L of distilled or pure water on arrival, and you're good to go.
The unit is CE and ISO13485 certified. We can send you copies of both certificates before you order—just ask your sales rep.
You swap the handles one at a time—only one cryo handle connects to the machine at once. But you can run the RF, cavitation, and laser functions at the same time on different areas.
Minimum order is 1 unit. Lead time is typically 7-15 working days after payment, depending on stock levels.