We've been sourcing these for about two years now, and they've pretty much become our go-to for 1.2GHz drone countermeasure work — teh 50dBm output is genuinely useful for real-world jamming scenarios, not just spec-sheet figures.

Most buyers are either defense contractors or security teams needing to protect sensitive airspace, though we've also had some odd requests form commerical drone operators testing signal resilience. It's not designed for cell jamming or anything outside that narrow 1.2GHz band, just so you're clear.

The thing fits in a surprisingly small aluminun housing — 170x94x26.5mm — and weighs 710g, which means you can mount it on a tripod or even a small gimbal without much fuss. Power draw is under 6.5A at full tilt, but you'll need a solid +30V DC supply (it handles 24-36V, so check your regulator). The N-50KFD output connector is standerd for high-power RF, thank god — no weird adapters needed.

What caught our eye was the built-in modulation scanning source with external input switching via a 7W2 plug; you can feed it your own signal if the internal one doesn't fit your protocol. Input VSWR is ≤1.35 and output ≤1.3, which basically means minimal reflected power and less heat stress on the amplifier stage.

We usually have these in stock, say 50 units or so, but lead time can stretch to 20 days if we're between batches — just confirm before ordering. Warranty is one year, and our company provide CE, ISO, RoHS, and GS certs with each unit. The operating range is -20°C to +60°C, so it'll handle most environments fine, though humidity above 95% non-condensing might be pushing it a bit.

Also, something you wouldn't think to ask: the passband fluctuation is ≤2.5dB, but the power flatness holds at 45±1.0dB across band — that tighter tolerance actually matters when you're trying to maintain consistent jamming coverage without hot spots. Anyway, it's a solid piece of kit for the price.
The MOQ is typically 10 units for the first order. We can be flexible for larger repeat orders, but standard stock items start at 10 pieces.
Standard lead time is 7-10 business days for quantities up to 50 units. If you need it faster, we can prioritize production for an additional fee.
Yes, we include CE, ISO, RoHS, and GS certification copies with every order. Just let us know which format you prefer—PDF or hard copy.
Absolutely. The standard unit uses an N-50KFD output and a 7W2 plug with 3 control lines, but we can change the connector type or wiring pinout based on your request. Lead time may increase by 3-5 days for custom versions.
Keep it in a dry, cool place between -20°C and +60°C with humidity below 95% non-condensing. Store it in the original anti-static packaging to avoid damage to the aluminum alloy casing and connectors.