So you're dealing with a distribution panel that keeps tripping under moderate surge loads or worse, just can't clear a fault fast enough, and teh whole line goes dark — that's the kind of headache we see a lot with older breakers or undersized units.

The EM2-160L basically handles that by using an air arc-extinguishing chamber that snuffs out the arc in about 20ms or so, which is faster than most thermal-magnetic units we've tested, and it's 25kA breaking capasity at 400VAC, 50Hz, so it'll take a solid short without welding contacts.

You've got four current options — 125A, 160A, 200A, and 250A — and we usually recommend the 200A for most indutrial feeders since it gives you a bit of headroom without oversizing the panel; the fixed insallation is straightforward, just bolt it onto the DIN rail or backplate, and the IP20/IP40 rating means it's fine for clean indoor cabinets but don't put it near washdown areas.
It's not designed for motor starting duty, actually, so if you're protecting a big compressor that cycles hard, you'd want a dedicated motor-protective breaker instead — the EM2-160L really shines in main distribution or sub-feed application where overcurrent and overvoltage protection are the priority.

One thing most buyers don't think to ask is that circuit-breaker failure protection kicks in if the main contacts weld shut, which is a rare but serious failure mode — we've seen it happen maybe twice in ten years, but when it does, this feature saves the downstream equipment.

Lead time is usually 2-3 weeks for the 250A version since it's less common, but we stock the 125A and 160A units in our warehouse, so those ship within days — anyway, the COA comes with every unit, and the CE cert is on file if your inspector needs it.
The EM2-160L comes in 125A, 160A, 200A, and 250A ratings. You pick the one that matches your load.
Our MOQ for the EM2-160L is 10 pieces per order. We can discuss exceptions for larger volume commitments.
Yes, the EM2-160L is CE certified, and we include a copy of the certificate with each shipment. Let us know if you need any additional documentation.
The EM2-160L is designed for fixed installation in a standard upright position. Mounting it differently could affect performance, so we recommend following the manual.
Lead time is usually 15 to 20 working days for standard quantities. We can rush it if you need it faster, just let us know.