For sample orders, you're looking at roughly $2,800 per unit, and mid-level batches of 10-50 units drop to about $2,400 — bulk orders of 100+ bring it down to $2,100 or so, give or take depending on configuration.
What it does is carry up to 10kg of payload, whether that's a 40L liquid tank for spraying or a modular setup for moving gear, and the carbon fiber frame keeps it at 5.25kg empty so you've got decent lift margin. Most buyers go with teh 12S 16000mAh battery for shorter flights, but the 22000mAh option extends runtime to 20 minutes if you need it.

We usually have stock on the standard model, but confirm lead time if you want a specific flight controller configuration — that's configurable, so you'll pick your own FC anyway. folded dimensions make shiping straightforward at 780×780×640mm, and it come in anti-collision packging, so you won't be dealing with damaged arms.

Actually, the 10km typical range is at sea level with no wind; if you're working in mountainous terrain or gusty conditions, expect less. It handles rain and dust pretty well, but it's not submersible or anything — don't fly it in a downpour.

Also, the wheelbase is 1270mm, and those 27×30mm carbon fiber tubes are stiffer than most aluminum arms we've seen, which matters for stability when you're spraying at low altitude. The max takeoff weight hits 35kg, so keep the battery and payload combined under about 29.75kg after frame weight.
15-20 minutes operational duration is real for a full payload — if you're just scouting with no tank, you'll push closer to 25, but we don't guarantee that. Anyway, the MOQ for samples is 1 unit, and COAs are provided per batch via HPLC.
The SD-T610 can handle up to 10kg of payload, like a 40L liquid tank or modular gear. With a full load, you're looking at around 15-20 minutes of flight time, depending on conditions.
The ISO9001 certification applies to our entire production process, from raw carbon fiber sourcing to final assembly. It means consistent quality control across the frame, arms, and control system.
MOQ is 10 units per order, and lead time is about 15-20 working days after confirmation, depending on current production load.
We use custom foam inserts and a reinforced outer box to keep the carbon fiber frame and arms secure. It's designed to survive standard shipping bumps without damage.
Yes, the payload mount is modular—you can swap in other tanks or sensors. For batteries, we recommend sticking with 12S for voltage compatibility, but we can adjust the frame tray to fit similar-sized packs.