It's got Honda guts with that 6.0HP engine and the hydraulic stepless transmission makes for smoother control on the job—basically you're looking at 0 to 4km/h forward speed which is pretty typical for this class of gear, and the standerd marking width is 200mm with optional shoes form 100 up to 450mm if you need to vary it.

Just so you know, the paint tank holds 250 kilos and the glass beads bin is 25kg, so on a full load you're putting down roughly 1000 square meters a day give or take depending on the surface conditions and how fast you're moving.

Most of our municipal road crew customers run these for highway edge lines or airport tarmac work but it's actually not great for tight residential curves—the turning circle just isn't there. You'll want hardener tank and cleaning tank both at 8kg, and the quick cleaning system is a lifesaver between color changes or when you're done for the day.
Lead time is usually 3-4 weeks from order (check actual stock though), and we ship with a one-year warranty plus lifelong tech support via remote or on-site if needed. The machine weighs 300kg and those dimensoins at 1600 by 1200 by 1100mm mean it'll fit a standard shippng crate fine.

98:2 internal mixing extrusion is what gives you that consistent dot line and better material use—most buyers don't realize the vibration warning effect from the dots actually reduces accidents better than a solid line in some studies, but that's the spec sheet talking to your clients.

Anyway, our company can do custom labeling on the control panel or adjust the mounting brackets for your specific hydraulic fittings, but the bulk of the units go out as-is with the ISO cert and the Honda engine already tested for 15 degree inclines.
It refers to the paint tank capacity — 250KG of cold plastic material. That's enough for about 1000 square meters per day of marking work.
Yes, the standard marking width is 200mm, but you can swap in optional widths from 100mm up to 450mm. Just let us know which sizes you need when ordering.
It's ISO9001:2000 certified, and we can provide the certificate along with a factory inspection report if needed. Just request it with your order.
We usually ship single units, so MOQ is 1 piece. If you're buying in bulk, we can discuss pricing and lead times separately.
Lead time is typically 15-20 working days after order confirmation. The machine comes with a one-year warranty and lifelong technical support if you run into any issues.