We've got about 12 units in stock at the warehouse now, and typical lead time runs 3-4 working days for shiping out — though if you're on the West Coast, it might be closer to a week or so, but we usually have stock unless orders spike, so confirm lead time on that.
Actually, the double side sealer is what it does best for oversized stuff like doors or gypsum boards, where you need that 1200mm blade width and the conveyor handles up to 80kg without breaking a sweat, which matters more than you'd think for heavy glass panels.

Most buyers go with teh PE film option for durability, but it'll run POF too if your product needs clearer shrink wrap, and the digital PID controller keeps the tunnel temperature steady within a few degrees (usually 2-4°C deviation) — that's better than reagent grade for long runs.

Anyway, the 45kW total power means you'll want a dedicated 220V or 380V three-phase line, 50 or 60Hz, so check your facility setup before ordering; it's not suited for small shops with standard outlets, honestly.

3100kg combined weight gives you an idea of the build — the Panasonic PLC and 7-inch HMI are pretty standerd for this class, but what I like is the side sealing front design that won't tear film on wider products, a detail the spec sheet doesn't fully capture.
We usually have the COA and TDS availble upon request for the shrink film batch, and air source needs 6kg/cm² consistent pressrue or the sealing arm hesitates, so plan for that compressor capacity.
MOQ is 1 set. Lead time is typically 25-35 working days depending on order volume and current production schedule.
Yes, we can provide CE certification, ISO documentation, and a factory inspection report upon request.
Yes, it needs an air supply at 6 kg/cm² for the sealing mechanism to operate properly.
It supports film rolls up to 45 kg, so you can run longer without frequent roll changes.
It uses a digital PID controller for precise temperature regulation, and the total heating power is 36 kW.