Basically you're looking at a 15-ton frame-type roll-off that handles loads from 1000 all the way up to 15000 lbs, with the tarping system and LED work lights already built in—most buyers go with the 14x7 foot size but our company can customize overall dimensions to whatever you need. It's got a hydraulic braking system and 235/80r16 tires on three axles (four tires total), and the self-dumping mechanism is standerd so you're not fighting with manual unloading.

We see these mostly with construction and demolition outfits who need something tough enough for daily abuse—the high-strength steel frame holds up better than regular steel for this kind of work, and the tarp system keeps debris contained during transport. One thing you might not think to ask: the LED work lights are wired with a quick-disconnect harness, so replacing a burned-out light takes about 5 minutes instead of rewiring the whole trailer. It's not suited for light-duty yard work, honestly, because the suspension is built for constant heavy hauling.

MOQ is just 1 unit, so you're not forced to buy a fleet if you only need one for a specific job. Lead time is usually 20 days or so (check for current production schedule), and we ship via 40HQ container form Shandong—ISO/TS16949 and CCC certified, with a 3-year warranty on the trailer itself and 1 year on after-sales parts support. Teh trademark is XINTUO if that matters for your paperwork.

Color and overall size are both customizable, so you can match fleet colors or tweak dimensoins to fit tight job sites. One caveat: ABS is not included on this model, so if you're hauling in wet conditions regularly, you'll want to factor that into your braking strategy. We usually have stock but confirm lead time—sometimes raw steel shortages bump delivery by a week or so.

The tarping mechanism uses a simple manual crank system (tent-type cover), which is actually easier to repair in field than automated ones—fewer electronics to fail. About 3-4 people can replace the tarp canvas in under an hour if it tears, which happens with sharp debris loads. That's a detail most buyers don't think about until they're three months in.
MOQ is just 1 PC, so you can order a single unit to test it out.
Yes, we hold both ISO/TS16949 and CCC certifications, so you get quality documentation with every trailer.
Absolutely — overall size and color are both custom made to your specs, just let us know what you need.
Typical lead time is around 30 days after order confirmation, but it depends on the customization complexity.
It's packed in a 40HQ container for ocean freight, with the tarp system and LED work lights pre-installed.